Abdul-Aziz, A. R. 2001. Unraveling of BOT scheme: Malaysia's Indah water konsortium. Journal of Construction Engineering and Management, 127, 457-460.
Ameyaw, E. E. & Chan, A. P. 2013. Identifying public‐private partnership (PPP) risks in managing water supply projects in Ghana. Journal of Facilities Management, 11(2), 152-182.
Amiri, O., Ayazi, A., Rahimi, M. & Khazaeni, G. 2021. Risks of water and wastewater PPP projects: an investors’ perspective. Construction Innovation, 22(3), 87.
Cui, C., Liu, Y., Hope, A. & Wang, J. 2018. Review of studies on the public–private partnerships (PPP) for infrastructure projects. International Journal of Project Management, 36, 773-794.
Cunha Marques, R. & Berg, S. 2011. Public‐private partnership contracts: a tale of two cities with different contractual arrangements. Public Administration, 89(4), 1585-1603.
Eskandari, M., Taghavifard, M., Vanani, I. R. & Noori, S. G. 2021. An intelligent hybrid model for determining public-private partnership in Iranian water and wastewater industry based on collective tree algorithms. Journal of Water and Wastewater, 32(1), 69-90. (In Persian)
Ezeldin, A. & Badran, Y. 2013. Risk decision support system for public private partnership projects in Egypt. International Journal of Engineering and Innovative Technology, 3, 479-486.
Hodge, G. A., Greve, C. & Boardman, A. E. 2010. Conclusions: Public–Private Partnerships–International Experiences and Future Challenges. Edward Elgar Publishing. Cheltenham, UK.
Hwang, C. L. & Yoon, K. 1981. Methods for Multiple Attribute Decision Making. Multiple Attribute Decision Making. Springer. Helderberg, Berlin, Germany.
Kahinda, J. M. M., Taigbenu, A. E. & Boroto, J. R. 2007. Domestic rainwater harvesting to improve water supply in rural South Africa. Physics and Chemistry of the Earth, Parts A/B/C, 32(15-18), 1050-1057.
Marin, P. 2009. Public Private Partnerships for Urban Water Utilities: A Review of Experiences in Developing Countries. The International Bank for Reconstruction and Development/The World Bank Publishing. Washington. USA.
McQuaid, R. W. & Scherrer, W. 2010. Changing reasons for public–private partnerships (PPPs). Public Money and Management, 30(1), 27-34.
Mishra, A. K. 2018. Sustainability and risk assessment of Salyankot water supply project in post-earthquake scenario. International Journal of Operations Management and Information Technology, 8(1), 1-30.
Mishra, A. K. & Bhandari, S. 2018. Performance assessment of ongoing construction projects under town development fund, Nepal. International Journal of Advanced Research in Civil and Structural Engineering, 1, 27-39.
Nozari Poor, A. R., Ghasem Sharabiani, M. & Olad Ghaffari, P. 2017. Public-private partnership in the water and wastewater industry. Journal of Water and Sustainable Development, 4(1), 9-20. (In Persian)
Rassouli, B., Kheradyar, S. & Banimahd, B. 2018. Identify, rank and allocate critical risk the stages of public–private partnership by delphi technique in the context of resistance economy (case study: water and sewage industry Guilan Province). Journal of Investment Knowledge, 7(27), 125-140. (In Persian)
Rezaeenour, J., Mousavi Saleh, M. & Kolahkaj, A. R. 2018. Analyzing the risk factors of private–public partnerships for water supply projects using fuzzy synthetic evaluation: a case study of Iranian water supply projects. Water Science and Technology: Water Supply, 18(3), 1005-1019.
Rezaeenour, J. & Mousavi Saleh, M. 2017. Evaluation and ranking of public-private partnership risk factors in water supply projects, using FMEA and Fuzzy synthetic evaluation methods: a case study of Qom. Iran-Water Resources Research, 13(4), 100-117. (In Persian)
Rezaei, J. 2015. Best-worst multi-criteria decision-making method. Omega, 53, 49-57.
Rezaei, J. 2016. Best-worst multi-criteria decision-making method: some properties and a linear model. Omega, 64, 126-130.
Roozbahani, A., Ghased, H. & Shahedany, M. H. 2020. Inter-basin water transfer planning with grey COPRAS and fuzzy COPRAS techniques: a case study in Iranian central plateau. Science of the Total Environment, 726, 138499.
Sachs, T., Tiong, R. & Wang, S. Q. 2007. Analysis of political risks and opportunities in public private partnerships (PPP) in China and selected Asian countries: Survey results. Chinese Management Studies, 1(2), 126-148.
Sadeghi, S., Kazemi Kia, S., Kheirfam, H. & Hazbavi, Z. 2016. Experiences and consequences of inter-basin water transfer worldwide. Iran-Water Resources Research, 12(2), 120-140. (In Persian)
Sohrabinejad, A. & Rahimi, M. 2015. Risk determination, prioritization, and classifying in construction project case study: gharb Tehran commercial-administrative complex. Journal of Construction Engineering, 2015, 1-10.
Wibowo, A. & Mohamed, S. 2010. Risk criticality and allocation in privatised water supply projects in Indonesia. International Journal of Project Management, 28, 504-513.
Xu, Y., Yeung, J. F., Chan, A. P., Chan, D. W., Wang, S. Q. & Ke, Y. 2010. Developing a risk assessment model for PPP projects in China A fuzzy synthetic evaluation approach. Automation in Construction, 19, 929-943.
Yin, H., Li, Y. F. & Zhao, D. M. 2015. Risk factor empirical research of PPP projects based on factor analysis method. American Journal of Industrial and Business Management, 5, 383.