1-Watkins, D.W., and McKinney, D.C. (1997). “Finding robust solutions to water resources problems.” J. Water Resources Planning and Management, 123 (1), 49-58.
2-Elshorbagy, W., Yakowitz, D., and Lansey, K. (1997). “Design of engineering systems using a stochastic decomposition approach.” J. Engineering Optimization, 27 (4), 279-302.
3-Jenkins, M.W., and Lund, J.R. (2000). “Integrating yield and shortage management under multiple uncertainties.” J. Water Resources Planning and Management, 126 (5), 288-297.
4-Lund, G.R., and Israel, M. (1995). “Optimization of transfer in urban water supply planning.” J. Water Resources Planning and Management, 121 (1), 41-48.
5-Wilchfort, G., and Lund, J.R. (1997). “Shortage management modeling for urban water supply systems.”
J. Water Resources Planning and Management, 123 (4), 250-258.
6-Maqsood, I., Huang, G.H., and Yeomans, J.S. (2005(. “An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty.” European J. of Operational Reserch, 165, 208-225.
7-Chung, G., Lansey, K., and Bayraksan, G. (2009). “Reliable water supply system design under uncertainty.”
J. Environmental Modelling and Software, 24 (4), 449-462.
8- Nabaviavpour, M., Pourabade, M., and Pourabade, T. (2008). “Water pipeline path optimization by artificial intelligence (fuzzy logic), case study: Water delivery to Siahpoush rural lands.” Fourth National Congress on Civil Engineering, University of Tehran. (In Persian)
9- Tabesh, M., and Zabihi, M. (2008). “Effects of qualitative constraints in water distribution network optimization.” Fourth National Congress on Civil Engineering, University of Tehran. (In Persian)
10- Rastegaripour, F., and Sbouhi, M. (2010). “An optimization model for kardeh reservoir operation using interval-parameter, multi-stage, stochastic programming.” J. Water and Wastewater, 75, 88-98. (In Persian)
11- Borhani, A., and Moradi, A.M. (2010). “Application of ant-colony-based algorithms to multi-reservoir water resources problems.” J. Water and Wastewater, 76, 81-91. (In Persian)
12- Hoseini Abari, S.H. (2000). Zayandehrood, from source to swamp, Golha Pub., Isfahan. (In Persian)
13- Safavi, H.R., and Afshar, A. (2006). “Integrated water resources modeling, case study: Zayandehrood basin.” Second Conference on Water Resources Management, Isfahan University of Tech., Isfahan. (In Persian)
14- Mardani, M., Sakhdari, H., and Sabouhi, M. (2011). “Application of multi-objective programming and degree of conservative controller parameters in agricultural planning, the case study: Mashhad district.”
J. Agricultural Economics Research, 2, 161-187.
15- Regional Water Organization of Isfahan Province. (2008). Statistics of water transfer between basins, Isfahan. (In Persian)
17- Jehad-e-Keshavarzi Organization of Isfahan Province. (2009). Statistics relating to the use of agriculture inputs, Isfahan. (In Persian)
19-Bertsimas, D., and Sim, M. (2004). “The price of robustness.” Operations Research, 52 (1), 35-53.
20-Clark, R.M., Sivaganesan, M., Selvakumar, A., and Sethi, V. (2002). “Cost models for water supply distribution systems.” J. Water Resources Planning and Management, 128 (5), 312-321.
21-US. Army Corps of Engineers. (1980). Methodology for areawide planning studies, Engineer Technical Letter No. 1110-2-502, Washington, D.C.
22-Walski, T.M., Brill, E.D., Gessler, J., Goulter, I.C., Jeppson, R.M., Lansey, K., Lee, H., Liebman, J.C., Mays, L., Morgan, D.R., and Ormsbee, L. (1987). “Battle of the network models: Epilogue.” J. Water Resources Planning and Management, 113 (2), 191-203.
23-Tang, C.C., Brill, E.D., and Pfeffer, J.T. (1987). “Optimization techniques for secondary wastewater treatment system.” J. Environmental Engineering, 113 (5), 935-951.