The disposal of excess sludge from wastewater treatment plant represents a rising challenge in activated sludge processes. Hence, the minimization of excess sludge production was investigated by increasing the dissolved oxygen in aeration basin. Units of the pilot include: Primary sedimentation tank, aeration basin, secondary sedimentation tank, and return sludge tank. Volume of aeration basin is 360 l and influent flow rate is 90 L/h. Influent of pilot is taken from effluent of grit chamber of Isfahan's North Wastewater treatment plant. The experiments were done on different parts of pilot during the 5 month of study. Results show that increase of dissolved oxygen in aeration tank affect on decrease of excess sludge. Increase of dissolved oxygen from 0.5 to 4.5 mg/L resulted in 25% decrease of excess sludge. Variation of dissolved oxygen affect on settleability of sludge too. By increase of dissolved oxygen, SVI decreased and then increased. Value of 1-3 mg/L was the adequate range of dissolved oxygen by settleability of sludge and optimum range was 2-2.5 mg/L. It could be concluded by increasing of dissolved oxygen up to of 3 mg/L, sludge settleability significant decreased.

Keywords


1- ترکیان، ا. (1374). مهندسی محیط زیست، جلد اول: آب و فاضلاب، کنکاش، اصفهان، چاپ اول.
2- Tchobanoglous, G. Burton, F. (1991). Wastewater engineering, treatment, disposal, and reuse, McGraw-Hill, Metcalf & Eddy, Inc, USA.
3- Liu, Y., Tay, J.H. (2001). “Strategy for Minimization of Excess Sludge Production from the Activated Sludge Process.” J. Biotechnology Advances. 19, 97-107.
4- Chudoba, P., Chevalier, J.J., Chang, J., and Capdeville, B. (1997). “Effect of Anaerobic Stabilization of Activated Sludge on its Production Under Batch Conditions at Various S0/X0 Ratios.” J. Water Sci. Technol., 23, 917-26.
5- Kamiya, T., Hirotsuji, J. (1998). “New Combined System of Biological Process and Intermittent Ozonation for Advanced Wastewater Treatment.” J. Water Sci. Technol., 38, 145-153.
6- Carrio, L.A., Lopez, A.R., Krasnoff, P.J., and Donnelon, J.J . (1985). “Sludge Reduction by in-Plant Process Modification: New York City’s Experiences.” J. Water Pollut. Control Fed, 57, 116-121.
7- Abbassi, B., Dullstein, S., and Rabiger, N. (2000). “Minimization of Excess Sludge Production by Increase of Oxygen Concentration in Activated Sludge Flocs: Experimental and Theoretical Approach.” J. Water Res., 34, 139-146.
8- Westgarth, W.C., Sulzer, F.T., and Okun, DA. (1964). “Anaerobiosis in the activated sludge process.” Proceeding of the Second IAWPRC Conference, Tokyo, 43-55.
9- Stall, T.R., Sherrard, J.M. (1976). “Effect of Wastewater Composition and Cell Residence Time on Phosphorus Removal in Activated Sludge.” J. Water Pollut. Control Fed., 48, 307-22.
10- Wunderlich, R., Barry, J., Greenwood, D., and Carry, C. (1985). “Start- up of a High- Purity, Oxygen-Activated Sludge System at the Los Angeles County Sanitation Districts, Joint Water Pollution Control Plant.” J. Water Pollut. Control Fed. 57, 1012-18.
11- Boon, A.G., Burgess, D.R. (1974). “Treatment of Crude Sewage in Two High- Rate Activated Sludge Plants Operated in Series.” J.Water Pollut. Control. 74, 382-388.