River Stream-Flow and Zayanderoud Reservoir Operation Modeling Using the Fuzzy Inference System

Document Type : Research Paper

Authors

1 PhD Student, Department of Civil Engineering, Sharif University of Technology

2 Professor, Department of Civil Engineering, Sharif University of Technology

3 Associate Professor, Department of Civil Engineering, Sharif University of Technology

Abstract

The Zayanderoud basin is located in the central plateau of Iran. As a result of population increase and agricultural and industrial developments, water demand on this basin has increased extensively. Given the importance of reservoir operation in water resource and management studies, the performance of fuzzy inference system (FIS) for Zayanderoud reservoir operation is investigated in this paper. The model of operation consists of two parts. In the first part, the seasonal river stream-flow is forecasted using the fuzzy rule-based system. The southern oscillated index, rain, snow, and discharge are inputs of the model and the seasonal river stream-flow its output. In the second part, the operation model is constructed. The amount of releases is first optimized by a nonlinear optimization model and then the rule curves are extracted using the fuzzy inference system. This model operates on an "if-then" principle, where the "if" is a vector of fuzzy permits and "then" is the fuzzy result. The reservoir storage capacity, inflow, demand, and year condition factor are used as permits. Monthly release is taken as the consequence. The Zayanderoud basin is investigated as a case study. Different performance indices such as reliability, resiliency, and vulnerability are calculated. According to results, FIS works more effectively than the traditional reservoir operation methods such as standard operation policy (SOP) or linear regression.

Keywords


1- تشنه لب، م.، صفار پور، ن.، و افیونی، د. (1378). سیستم‌های فازی و کنترل فازی، دانشگاه خواجه نصیر طوسی، تهران.
2- Huang, W. C. (1996). “Decision support system for reservoir operation.” Water Resour. Bull. , 32 (6), 1221- 1232.
3- Saad, M., Bigras, P., Turgeon, A., and Duquette, R. (1996). “Fuzzy learning decomposition for the scheduling of hydroelectric power systems.” Water Resour. Res., 32(1), 179- 186.
4- Fontane, D. G., Gates, T. K., and Moncad, E. (1997). “Planning reservoir operations with imprecise objectives.” J. Water Resour, Plan Manage., 123(3), 157- 162.
5- Bardossy, A., and Duckstein, L. (1995). Fuzzy rule–based modeling with application to geophysical, In: Biological and engineering systems, 1st Ed., CRC and Boca Raton, FL, USA.
6- Kosko, B. (1992). Neural networks and fuzzy systems, 1st Ed., Prentice – Hall, Englewood Cliffs, N. J.
7-Russel, S. O., and Campbell, P. F. (1996). “Reservoir operating rules with fuzzy programming.” J. Water Resour. Plan. Manage., 123(3), 165-170.
8- Sherestha, B. P., Duckstein, L., and Stakiv, E. Z. (1996). “Fuzzy rule–based modeling reservoir operating.” J. Water Resour. Plan. Manage., 122(4), 262-269.
9- Dubrovin, T., Jolma, A., and Turunen, E. (2002). “Fuzzy model for real – time reservoir operation.” J. water Resour. Plan. Manage., 128 (1), 66-73.
10- Jolma, A., Turunen, E., and Kummu, M. (2001). “Reservoir operation by fuzzy reasoning.” Proc., International Congress on Modeling and Simulation, MODSIM, Camberra, Australia, 10-13.
11- دفتر مطالعات آب و محیط زیست. (1384). مطالعات پیش‌بینی آورد حوضه آبریز زاینده‌رود با استفاده از داده‌های تصاویر ماهواره‌ای و زمینی، دانشکده مهندسی عمران، دانشگاه صنعتی شریف.
12- Labadie, W. J. (2004).“Optimal operation of multireservoir systems: state-of-the-art review.” J. Water Resour. Plan. Manage., 130(2), 93-111.
13- Hashimoto, T., Stedinger, J. R., and Loucks, D. P. (1982). “Reliability, resiliency, and vulnerability criteria for water resources system performance evaluation.” Water Resources Research, 18 (1), 14-20.