1- تشنه لب، م.، صفار پور، ن.، و افیونی، د. (1378). سیستمهای فازی و کنترل فازی، دانشگاه خواجه نصیر طوسی، تهران.
2- Huang, W. C. (1996). “Decision support system for reservoir operation.” Water Resour. Bull. , 32 (6), 1221- 1232.
3- Saad, M., Bigras, P., Turgeon, A., and Duquette, R. (1996). “Fuzzy learning decomposition for the scheduling of hydroelectric power systems.” Water Resour. Res., 32(1), 179- 186.
4- Fontane, D. G., Gates, T. K., and Moncad, E. (1997). “Planning reservoir operations with imprecise objectives.” J. Water Resour, Plan Manage., 123(3), 157- 162.
5- Bardossy, A., and Duckstein, L. (1995). Fuzzy rule–based modeling with application to geophysical, In: Biological and engineering systems, 1st Ed., CRC and Boca Raton, FL, USA.
6- Kosko, B. (1992). Neural networks and fuzzy systems, 1st Ed., Prentice – Hall, Englewood Cliffs, N. J.
7-Russel, S. O., and Campbell, P. F. (1996). “Reservoir operating rules with fuzzy programming.” J. Water Resour. Plan. Manage., 123(3), 165-170.
8- Sherestha, B. P., Duckstein, L., and Stakiv, E. Z. (1996). “Fuzzy rule–based modeling reservoir operating.” J. Water Resour. Plan. Manage., 122(4), 262-269.
9- Dubrovin, T., Jolma, A., and Turunen, E. (2002). “Fuzzy model for real – time reservoir operation.” J. water Resour. Plan. Manage., 128 (1), 66-73.
10- Jolma, A., Turunen, E., and Kummu, M. (2001). “Reservoir operation by fuzzy reasoning.” Proc., International Congress on Modeling and Simulation, MODSIM, Camberra, Australia, 10-13.
11- دفتر مطالعات آب و محیط زیست. (1384). مطالعات پیشبینی آورد حوضه آبریز زایندهرود با استفاده از دادههای تصاویر ماهوارهای و زمینی، دانشکده مهندسی عمران، دانشگاه صنعتی شریف.
12- Labadie, W. J. (2004).“Optimal operation of multireservoir systems: state-of-the-art review.” J. Water Resour. Plan. Manage., 130(2), 93-111.
13- Hashimoto, T., Stedinger, J. R., and Loucks, D. P. (1982). “Reliability, resiliency, and vulnerability criteria for water resources system performance evaluation.” Water Resources Research, 18 (1), 14-20.